G3M97 Double Project: Post-Hasse

Project Links

Home Page

Project Report
(1024 KB)
26/06/2001

Finished Applet
21/02/2001

Post-Hasse
11/12/2000

Pre-Hasse
3/12/2000

Project Update
12/11/2000

Matrix Groups
27/10/2000

Example Applets
16/10/2000

Hello Applet
4/10/2000

Matrix Groups: Week 11 Update

With the algorithm for constructing the Hasse diagram virtually complete, the majority of the code for the project has now been completed. However, I need to sort out bugs such as updating the scroll panels of the diagram in real time, getting a proper representation of the elements of the group in terms of a standard form, and proper exception handling.

Matrix Group Calculator (Source Code: GroupApplet.java, Matrix3x3.java, GroupList.java, links.java, HasseCanvas.java)
Code Compiled on 11th December, 2000

 